Energy: Electric service reliability: outage minutes and interruptions per customer (EIA).
Display approved under decisions/0020-sponsor-report-counsel-review-approved-2026-11-02.md (with decisions/0011), building on the sponsor’s public-domain determination (decisions/0011). Public domain does not remove attribution, vintage or limitation requirements. Export, API and commercial use are not approved.
- Attribution
- U.S. Energy Information Administration, Form EIA-861
- Period
- Calendar years 2023 to 2025
- Geography vintage
- States and the District of Columbia
- Rights basis
- “Display only, noncommercial public HTML, under decisions 0011 and 0020; display rights reviewed by the sponsor under decision 0110. The counsel statement is relayed by the sponsor and no counsel document is in the repository. Export, API and commercial use remain review_required.” Dwight Ringdahl (sponsor): display-rights review recorded in decision 0110, building on the sponsor-reported counsel review of decision 0020; recorded by the engineering delegate
- Reading notes
- Minutes per customer per year (SAIDI); interruptions per customer per year (SAIFI); customers as a count.
- Raw evidence SHA-256 (combined over 3 files)
- 962eb7a482021abf0130b76397152799ef01521454697f40a7dc8d22c6f976a2 (sha256 of the sorted file checksums joined by newlines)
- Raw evidence SHA-256: EIA-861 2023 annual zip (Reliability_2023.xlsx, State Totals sheet)
- 0acd67ab84cdaef09fd47b4449f2c944f8731c2b3c695ec3a97bb6c0690a4d61 · retrieved 2026-11-04 · https://www.eia.gov/electricity/data/eia861/archive/zip/f8612023.zip
- Raw evidence SHA-256: EIA-861 2024 annual zip (Reliability_2024.xlsx, State Totals sheet)
- 77ce49c60ac5a6bad50c442fc401aad5404a21da875dc5cbaba353af5ede54de · retrieved 2026-11-04 · https://www.eia.gov/electricity/data/eia861/archive/zip/f8612024.zip
- Raw evidence SHA-256: EIA-861 2025 annual zip (Reliability_2025.xlsx, State Totals sheet)
- f59f6c732bf685fe0a1591b32227f5ce572dc0dfd26bb5caaeed128ac4e3a396 · retrieved 2026-11-04 · https://www.eia.gov/electricity/data/eia861/zip/f8612025.zip
Limitations
- Figures are the state totals EIA publishes from utility reports, covering utilities that reported under the IEEE 1366 standard or another method; the methods differ, utilities that did not report are not included, and the averages weight utilities by the customers EIA lists.
- SAIDI is the average total minutes without power per customer in the year; SAIFI is the average number of sustained interruptions per customer. Major event days are days of unusual storm or similar stress, as each utility defines them under its reporting method.
- EIA first published state totals in the 2023 data year, so earlier years are not shown. A value the source filed as "." is shown as Not reported, never as zero.
Source documentation · Source terms
This page is the same for every geography that cites this source. Return to the page you came from with your browser’s back button, or start at Follow the sources.