Energy: Electric generating capacity by energy source (EIA-860, county).
Display approved under decisions/0020-sponsor-report-counsel-review-approved-2026-11-02.md (with decisions/0011), building on the sponsor’s public-domain determination (decisions/0011). Public domain does not remove attribution, vintage or limitation requirements. Export, API and commercial use are not approved.
- Attribution
- U.S. Energy Information Administration, Form EIA-860 Annual Electric Generator Report (public domain)
- Period
- Survey year 2025, final release of September 10, 2026; generator status as of December 31, 2025
- Geography vintage
- Counties as named by EIA, matched by state and exact name to this site’s county list; Connecticut planning regions and Puerto Rico are Not reported
- Rights basis
- “Display only, noncommercial public HTML, under decisions 0011 and 0020; display rights reviewed by the sponsor under decision 0110. The counsel statement is relayed by the sponsor and no counsel document is in the repository. Export, API and commercial use remain review_required.” Dwight Ringdahl (sponsor): display-rights review recorded in decision 0110, building on the sponsor-reported counsel review of decision 0020; recorded by the engineering delegate
- Reading notes
- Nameplate capacity in megawatts (MW); generators and plants as counts.
- Raw evidence SHA-256: EIA Form EIA-860 2025 detailed data (final release), Schedule 3, Generator Data, operable units
- 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba · retrieved 2026-11-04 · https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip
Limitations
- These figures are nameplate capacity, not generation. Nameplate capacity is the maximum rated output stamped on a generator, in megawatts (MW), as reported by the plant operator to the U.S. Energy Information Administration on Form EIA-860 and rounded by EIA to the nearest tenth. It is not electricity produced, not output in any year and not what a plant delivers to the grid; actual generation is usually lower and differs by fuel, season and demand. Capacity is for survey year 2025, with status as of December 31, 2025.
- Only generators with EIA status OP are counted: operating, in commercial service and producing some electricity. Standby or backup units (SB), units out of service and expected back in the next calendar year (OA), and units out of service and not expected back (OS) are left out, as are proposed and retired units. A plant counts in every group that has an operating generator at it, so the plants in the groups can add to more than the plants in the last row, which counts each plant once.
- The group is EIA’s first listed energy source for the generator, the most predominant type of energy that fuels it. A generator that can burn more than one fuel is counted once, under that first source. Pumped-storage hydropower is in the hydroelectric group. Batteries and flywheels are their own energy storage group because they release stored energy rather than make new energy. Municipal solid waste, waste heat, other gases, purchased steam and any source not listed are in the last group.
- EIA-860 covers existing power plants connected to the electric grid with total generator nameplate capacity of 1 MW or greater, including their smaller generators. A county with no operating generator in the file shows 0 only because the file is meant to list every such plant; a plant below 1 MW, or one not connected to the grid, is outside the survey and not counted. A zero is a true zero, not a missing value.
- A value the file does not support is shown as Not reported, never as zero. EIA names the county and does not give a FIPS code, so each county is matched to this site’s county list by state and exact name (letters and numbers only, accents ignored, county-type words such as County and Parish dropped, Saint and St treated alike); an independent city written without the word City is matched only when no county has that name and exactly one independent city does. A generator whose county name does not match is not assigned to any county. In a state where that happened, a county with no assigned generator is Not reported rather than zero, and the table says how many generators could not be assigned.
- EIA reports Connecticut by its former eight counties, which this site’s planning regions replaced, so Connecticut’s planning regions are Not reported; the Connecticut state table uses every Connecticut generator. The Puerto Rico generators are not in the public file, so Puerto Rico is Not reported. These are county figures: capacity is counted in the county where the plant is located, and nothing is allocated to cities or places.
- Only totals by energy source group are shown. No plant name, owner, address or coordinate is published, and the figures do not identify any individual plant, although a county with one plant shows that plant’s capacity. The figures are counts and sums of generators, not rankings or comparisons of places, and they are not adjusted for population or area.
Source documentation · Source terms